Monday, May 21, 2012

As of Monday May 21 or How I spent my Victoria Day!!!!


This is the wee bathroom corner in the backroom. Once I saw the floor with the old and new panelling I decided we needed to paint the walls so ......... A queen sized bed is going to be added to this room on Wednesday and if you don't want to sleep in the same room as your bathroom, this isn't going to be the cottage retreat experience you are looking for.



This is the primer coat on the walls because we are painting raw wood, it just sucks up the paint like a sponge. The backroom is going to be the same colour as the front room - an off whitish colour with Cadbury Chocolate coloured trim. I wondered why I liked this colour until I saw it on the trim and then I knew where I had seen that colour before!!!!



Now we are in the frontroom. Three of the kitchen cupboards are here. Another drawer cupboard is now to the right and then a 24 inch stove which is hiding right now to the left. This is the water heater which is going to be installed in a wee building outside right under the kitchen window. There is also an upper cupboard going to the left of the window.



For the last two mornings, we have arrived at the job site at about 8:30 in the morning. It is just gorgeous as you can see. Can't wait to stay here!!!! Can you?



Hey, look at the new 10x10 deck that got built this week. I actually sat in a chair on it yesterday. Just lovely!!!! You can also see the new screen door. The actual door door is going to be red. The deck is naturally shaded in the afternoon by the near by trees.





Hear is our awesome neighbour helping us install the kitchen cupboards and building a concrete counter top. It was so much fun. I put down lots of jewels and shells and rocks and only hope we will still be able to see them when we install the counter top later this week. It is going to be ground and polished and treated and will hopefully look like marble when finished!!!!



The counter top has been covered with plastic and left to rest for 3 days until it is ready to be unvailed. It is going to be very exciting!!!

Don't forget, to make a reservation email me at sheekey@bell.net or call me at 705 636-1679.

Wednesday, May 2, 2012

Wednesday, May 2nd, 2012


It was a big day at the job site today. Our sewage line was connected to the main line going to the town sewage line. When we arrived at the site we were delighted to see Ray's boat floating!!!! It even had a motor attached and no water on board!!!



The first thing they did was to dig this huge hole at the side of the cottage and put this concrete thing in. Inside the concrete was the mascserating pump which will chew up all of the waste from the cottage and spit it out!!! Yum......!!!!!



Then a trench was dug out to the lane where the main line is located going to the town sewage system eventually. The sides were collapsing constantly in the hole. It appeared to be very dangerous. They dug down about 7 feet so that the line we were joining into was above the water line. As quickly as they dug, the hole filled up with water. It was so great to have guys workin for us who knew what they were doing!!!!

Below you can see a neighbour who isn't convinced they know that they are doing!!!! They came out of the woodwork like flies to see what was going on!!!!! Biggest event on our street for quite a while obviously!!!!


Blogger is not being easy to get along with tonight. I can't delete the pics that are doubles so I appologize.

Above you can see Ray's boat afloat with ducks to keep it company. Then you get a peek at the new flooring we had installed yesterday. Finally you get to see what it looks like from the living room out. It really is a great view of the lake!!! I can't wait to stay here over night!!!

Saturday, April 28, 2012

Plumbing and windows.


You may not have thought anything was going on at The Barber's Cottage as I haven't written in few weeks but believe you me, there are almost daily happenings there!!!! .You can't see here but the bathroom and kitchen are roughed in plumber wise. This shot shows the new kitchen window where you can do dishes and look out over the lake. Further down you will see the old kitchen window. The black space to the left is to be filled in and I think there will be an upper kitchen cupboard there.



 This shows you all of the new windows in on two sides of the cottage. When they arrived yesterday to install them, the windows were two inches larger than the previous openings so it took a bit longer than I thought it would. They are actually coming back on Monday to finish the job. The screen door is off ready to have the new one installed. There is also a porch 10 ft.X 10ft. planned for right outside of the door.



This shows two of the three guys that worked on the windows. Here the windows are out and they started talking about not being able to finish the job as they blew a fuse. See how fast Val and Ray can go the hardware store to buy many boxes of fuses!!!!! One new fuse solved the problem for the rest of the day!!!!



This is the original panelling that was in the front room. It is lovely. The grain really stands out. Bit dark for me so I painted it off white. First a sealer and then a great paint over that. Let me tell you about the touquoise colour of the panelling, doors and trim. In the 50's there was a train derailment near Sundridge and many towns folk went out to the site and helped themselves to souveners of paint from the train. It was all the same colour, this tourquoise. I hear it can still be seen in many of the older homes that haven't been decorated in the last few years!!!!!!



This is the original window over what is going to be the sink and counter top area. I love the new window that you see above in pic #1. You can see the old and new paint here too.



This is our view. The other day we had Canada geese, hooded merganzas, ducks and a loon just off shore. We have also had deer prints on the sand infront of the cottage.

I think we are right on target and will have the place ready to rent by mid June. The windows will be finished Monday. Floors are being laid Tuesday. Septic intalled Wednesday and the electrician is coming on Thursday. This is a great local. We have seen a train in the middle of the afternoon. I'm not sure how many a day there are but I will. I'm really eager to stay here and work out all or any kinks that may be associated with the property so that if you are coming as a renter, everything will work and you will have an amazing time!!!!!!!!!

Friday, March 9, 2012

Introducing - The Barber's Cottage

What a strange name you may say. Well, let me explain. The front part of the cottage, on the right, was originally the barber's shop from downtown Sundridge and back in the 50's it was hauled out to the south end of town and placed on this little lot. There are some interesting little features inside that I intend on keeping which relate to the shop aspect.

I'm not sure when the back half was added but I will probably find out!!! Interestingly, there is a single step going down to the second half. Hmmmm ya gotta wonder on the logic there.

The whole place needs renoing. It needs a septic and water system first. It actually does have hydro!!! As soon as the ground is workable we will get going on that. Windows are the next big job and that can start as soon as we get home.

As this point, I'm thinking the front room will be the kitchen dining area. Backroom queen sized bed, couch/sitting area and bathroom stuff all in one room similar to what we have at home. All of the panelling and flooring needs to be replaced.



About now, you are probably wondering why I bought this gem. Well, when I stood on the land, I turned to Ray and said, "This feels good." The lake, Lake Bernard, is large and is famous for being the largest fresh water lake in the world without an island. It is very sandy and shallow for a long way. Fishing is supposed to be good.

We had been looking at propeties all summer and this one just seemed like the right one. I love the reno process and am getting pretty excited about getting it going at the beginning of April.



This is where you park.

The property was bought as an investment and for rental potential. I think we should be ready to go by the middle of June. If you can build a house in 4 months, surely you can reno a little cabin in two and a half.

The rent will be $125 a night or $800 a week. If you are interested in renting this gem to be, please contact me at sheekey@bell.net .

I have set up this blog so that you can follow along with the renos if you choose and to give renters an opportunity of seeing all aspects of the cottage. Inside and outside.